November 19th, 2008Wind Turbine With ATS Hybrid Tower
If you're new here, you may want to subscribe to my RSS feed. Thanks for visiting!
One of the world’s biggest wind turbines with a hybrid tower is being built at the wind test site in Grevenbroich west of Cologne. The tower combines a lower segment consisting of long, narrow pre-cast concrete components made by Advanced Tower Systems (ATS) and an upper segment made of conventional steel elements.
Leave a Reply
You must be logged in to post a comment.
